Construction Process Start to Finish
Below is a detailed overview of the construction steps involved in bringing your dream home to life, from start to finish:
Initial Contact & Consultation
-
Initial meeting to discuss:
-
Project goals and vision.
-
Budget and financial considerations.
-
Desired location or plot of land (if not already secured).
-
Timeline and potential challenges.
-
-
Company explains the process, services, and offers initial advice.
Design Phase
-
Client selects or provides design preferences (architectural style, size, layout).
-
Client works with Oostburg Lumber architect to create custom home plans.
-
Collaboration between customer, architect, and builder to refine the design.
-
Floor plans, elevations, interior features, etc.
-
-
Finalization of designs and key elements.
-
Customer reviews and approves final plans.
Permitting & Legal Approvals
-
The builder applies for necessary permits (zoning, construction, environmental, etc.).
-
Local authorities review and approve the designs and plans.
Changes or adjustments are made if the permits are not approved.
Groundwork & Foundation
-
Excavation and laying of the foundation (slab, crawl space, basement, etc.).
-
Installation of plumbing and electrical infrastructure within the foundation.
-
Foundation inspection and approval before moving on.
Roofing, Siding & Exterior Finishes
-
Roofing installed (shingles or metal).
-
Exterior siding or cladding applied.
-
Installation of windows and doors.
​
​​
​
Final Inspections
-
Local authorities conduct inspections for safety and building code compliance.
-
Any required adjustments or fixes made before final approval.
-
Final quality checks by builder to ensure everything is up to standard.
Walkthrough & Customer Approval
-
Client walkthrough with the builder to inspect the work.
-
Customer notes any final changes or corrections.
-
Final touch-ups and adjustments are made.
​
​
Site Assessment & Preliminary Planning
-
Site visit to assess land (if the customer owns a plot).
-
Considerations for zoning, land slope, accessibility, etc.
-
Discussions about utilities, road access, and other site-specific factors.
-
Initial design concepts and rough cost estimates.
​
​
Budget & Contract Negotiation
-
Detailed estimate and breakdown of costs (materials, labor, permits, etc.).
-
Discussion of payment schedule (deposit, progress payments, final payment).
-
Agreement on scope of work, project milestones, and timeline.
-
Signing of the formal contract that outlines all terms and conditions.
​
Pre-Construction Preparation
-
Final site preparation (clearing land, grading, etc.).
-
Delivery and organization of materials and equipment.
-
Set up of temporary utilities (water, electricity, waste, etc.) if necessary.
​
Framing & Structural Work
-
Framing of walls, roof, and floors begins.
-
Installation of doors and windows.
-
Structurally complete skeleton of the house takes shape.
-
Inspections for framing, plumbing, HVAC, and electrical rough-ins.
Interior Work Begins
-
Painting, flooring, and cabinetry installation.
-
Countertops, lighting fixtures, and other interior finishes are added.
-
Final plumbing fixtures (sinks, toilets, bathtubs) and appliances.
-
Tile work, cabinetry, and built-ins installed.
Landscaping & Exterior Completion
-
Final landscaping work: planting, grading, driveway, patio, fencing, etc.
-
Exterior lighting and outdoor features are completed.
​
​
Handover & Completion
-
Final payment is made at closing.
-
Homeowner receives keys, warranties, and any relevant documentation.
-
Final legal and ownership papers are transferred.
​